Wednesday, December 23, 2009

Progress Update - 12/23/09

December 23, 2009, Wednesday


So my developmental work was all due yesterday. Mine and Sean's were inexplicably placed in the wrong pile. Thankfully they were found untarnished and whole. I am really glad I finished so I don't have to worry about this part over break. When we come back from break we have the math and science report due. I will work on this over the break.

Thursday, December 17, 2009

Progress Update - 12/17/2009

December 17, 2009, Thursday
Tomorrow I will not be in class, so I'm doing my progress update today. I'm done with all of my drawings and I will post them soon. I just have to finish my plan of procedures now. This is going to be very thorough because it has to be and it makes sense for it to be so someone else could complete the construction if I were to vanish or something to that effect.

Tuesday, December 15, 2009

Progress Update - 12/15/09

December 15, 2009, Tuesday

Winter break is almost upon us and I am working on developmental work that is to be handed in on 12/22. I've just finished my orthographic drawing and am done with the isometric as well. I just need to finish the texture drawing and exploded isometric now. Hopefully AutoCAD will continue to cooperate and I will be able to finish my drawings in a timely fashion.

Tuesday, December 8, 2009

Progress Update - 12/8/09

December 8, 2009, Tuesday

Tomorrow I am meeting with the physics teacher to get my stability and buoyancy calculations straightened out. Once this is completed I can select and finalize appropriate dimensions. I spoke with him briefly and he said that we may have to adjust my stability calculations because the craft is on the water as opposed to on stable ground. Then all I will have to do is draw.

Friday, December 4, 2009

Progress Update - 12/4/09

December 4, 2009, Friday

This past week the main thing I have been working on are drawings. For my Developmental Work, which is due December 22, I need to have numerous drawings completed, some of which include orthographic, isometric, and exploded isometric views. I need to work on my plan of procedures which includes a supply list, material list, and part list. I alsoneed to find the total amount of water that needs to be displaced. I will ask the physics teacher a few questions about the calculations for stability, and change my dimensions if I have to.

Monday, November 30, 2009

Progress Update - 11/30/09

November 30, 2009, Monday

Last Tuesday, KR and I went to visit the salt marsh once again. We visited because last week the tide was at dead low. We needed to see the marsh while the tide was changing and the water was flowing. We needed these conditions because we needed to test the net.


Various Views of the Marsh



Close to the bridge. This is about where the craft would be deployed.







This is the opposite side of the marsh. This water is much shallower than the rest of the marsh.




During high tide there are no spots where the bottom rises above the surface of the water.





Net in the Water




Net Out of the Water








Although it is not visible, there is a comb jelly in the bottle.
Spring Scale Pictures



The force exerted by the net and a full sample are 25 Newtons.

Tuesday, November 24, 2009

Progress Update - 11/24/09

November 24, 2009, Tuesday

Today KR and I went to the Salt Marsh, but I will elaborate on that next time. Tomorrow our Bid Process is due and I have numerous materials to order. Some materials include plywood, fiberglass tape, resin, an anchor, and surfboard foam (spyderfoam). We have to send out bids to companies and hope that they take purchase orders.

Thursday, November 19, 2009

Progress Update - 11/19/09

November 19, 2009, Thursday

On Tuesday, KR and I went to the marsh to take a look around, take pictures, and test the plankton net. We immediately noticed that we had timed the tides too perfectly; we were looking at standing water with no current whatsoever. This was not good for testing the plankton net because we were unable to test the force on the plankton net when it is being reeled in against the current. However, this was still an educational experience because we learned that low tide is not an environment that is conducive to collecting samples in the boat. 

Wednesday, November 18, 2009

Monday, November 16, 2009

Progress Update - 11/16/09

November 16, 2009, Monday

I am writing my update today because tomorrow KR and I will be going into the field to work with plankton nets. We will be dropping a plankton net into the marsh off of a bridge. Then we will allow the net to collect a sample and we will retrieve it and learn all of the proper handling procedures.

Friday, November 13, 2009

Progress Update - 11/13/09

November 13, 2009, Friday

Yesterday, KR and I met with our teachers. They enlightened us to the fact that we had a form and we were trying to fit a function into it, rather than letting the function dictate the form. KR and I had been so focused on the boat part of the project we neglected the deployment and retrieval of the plankton net, the main aspect of the project. As a result, we have to backtrack some and redesign certain aspects of the boat to accommodate the net. The net is 22.5” in total length and it must be brought entirely out of the water. Therefore, we are going to make the boat higher above the water and use a pulley system to reel the net out all the way out of the water. Yesterday, I also learned that surfboards are made out of dense foam that is coated in fiberglass to keep it hard. This is a huge discovery because now I can design the hull to be made out of foam and do not need to worry about the resin from the fiberglass dissolving the foam.

Thursday, November 12, 2009

Progress Update - 11/12/09

November 12, 2009, Thursday

At this point in my project I have 5 completed alternate solutions for hull designs and a selected airboat design. The selected design is a pontoon airboat design with a hole in the middle of the craft for deploying a plankton net. I also designed a winch model for the anchor. Today I will reasearch water-proof materials to water-proof the airboat.

Wednesday, November 11, 2009

Progress Update - 11/11/09

November 11, 2010, Wednesday

Well, we just finished presentations a few days ago. And that concludes the 1st marking period. I guess mine was okay although it was a little lengthly because I had a few selection rejection reports to go over, not just one. Anyways, hopefully I'll get a good grade on it.

Wednesday, October 28, 2009

Individual Specifications

The final product will:

• Be mobile and easy to maneuver
• Be environmentally friendly
• Be water resistant
• Cause minimal disruption to the habitat it enters
• Designed to be used by a scientist to extend their “reach” into the environment
• Be safe to operate
• The hull needs to be designed so that it will remain stable
• Has to have a working anchor to keep the vehicle rooted to collect samples
• Have a working net to collect samples in

Thursday, October 1, 2009

Research Continued

KR and I were working with circuits the other day. We were testing out different types of circuits by connecting the power source to various motors and fans. Some of the power sources that we used were AA, AAA, and 9 volt batteries. We also used a solar panel to generate electricity. The solar panels were reasonably effective in generating electricity; however, this may have been because the panels absorbed energy from an overhead projector, and those are extremely powerful from close up. It was fairly effective because we both developed a more comprehensive understanding of circuits.

Wednesday, September 30, 2009

Individual Design Brief

Individual Brief - Design the hull of the vehicle and the plankton net.


\

Team Design Brief

To design and produce a noninvasive marine research vehicle that would cause with the least amount of disturbance to be used by a researcher to sample plankton in areas which would otherwise be impossible to enter without damaging the environment by walking or using other vehicles.



Selection/Rejection: Net Placement

     The final aspect of the body of this vehicle that I will deal with is the placement of the plankton net. The placement of the plankton net can be in a few places. It could be on the sides of the craft, underneath the craft, and behind the craft. The placement will be scored in three categories: affect on the catch due to disruption in the water, function, and how well it works with KR’s deployment design.
      The first design, the net on the sides of the craft would not be very affected by disruption in the water because it would not be in any wakes caused by the craft if it is far enough to the side. It would serve the function of catching the plankton well from the position on the side at any level in the water column. However, this design does not work well with KR’s “wind up” deployment method in which the net is attached to a string because it would not be able to get far enough to the side of the craft and could get trapped underneath.
     The second design, the net underneath the craft would not be disrupted by the craft’s affect on the water because it would be underneath the water. It would serve the function of collecting samples from deeper in the water, but would fail to collect samples from the surface of the water. This method does not work well with KR’s deployment method because it would have to be moved to underneath the craft, possibly short-circuiting the connection.
     The final design has the net behind the craft. This would be affected by the disruptions caused by the craft if it was kept close; however, it could be released further away by letting some more slack into the rope that ties it to the craft. It would function well because it would allow the net to sample from all areas of the water column. This method works in harmony with KR’s deployment method because the rope would not get in the way of the craft and the further the rope was let out, the less disruption in the water for the net.

Matrix


The following is the table used to determine which design is the best.


Selection/Rejection
1. Affect on the catch due to disruption in the water

2. Function

3. How well it works with KR’s deployment design










Based on this table, placing the net behind the craft received the highest score and is the location that will be used.

Tuesday, September 29, 2009

Selection/Rejection Report: Net Design

     The next element of the craft is the net design. The net needs to be able to either sink below the water or float toward the top based on what type of plankton need to be sampled. There are three types of nets that will be put to the test, a floating net, a sinking net, and a plain net. These nets will be given scores in 3 categories: adaptability, function, and complexity. The net with the highest score will be the net that is used.
     A floating net is the first design. This net is not very adaptable because it would already have floats attached to it. It would serve the function of floating on the surface and catching surface organisms very well, but that’s it. As for complexity it’s just a net with floats attached, so it is not very complicated.
     A sinking net is the second design. This net is not very adaptable because it would already have sinkers attached to it. It would serve the function of sinking in the water and catching organisms beneath the surface very well, but that’s it. As for complexity it’s just a net with sinkers attached, so it is not very complicated.
     A plain net is the last design on the drawing board. This net would very adaptable because it could just enter the water as it is with no further accessories, or little floats could be added so it could skim the surface of the water, or a little weight could be added to make the net sink. Since this net is highly adaptable, it would be able to serve the most functions. Furthermore, this net is very simple because it would be constructed with no additions and would be adjusted to each situation.

Matrix


The following is the table used to determine which design is the best.

Selection/Rejection
1. Adaptability
2. Function
3. Complexity



Based on this table, the plain net received the highest score and is the net that will be used.

Friday, September 25, 2009

Selection/Rejection Report: Hulls

There are a few main aspects to the body of this craft: The hull design, the net design, and the net placement.


The hull design is the most crucial dimension of my project. It will dictate every other aspect of the vehicle. There are 3 hull designs that KR and I developed for the hovercraft, a circular, triangular, and a “traditional” design. Each has its positives and its negatives. They will each be judged based on the specifications set forth earlier in this project.

The first design is the circular craft. KR and I thought that this design would not be very good for turning because it is round and would not cut through the air very well and restrict the craft from making sharp turns. The second aspect is weight distribution; considering the craft would be completely round it would lead to perfect weight distribution. The circular craft would be able to use foam torpedoes to a limited extent to keep it afloat. They would not work that well because the foam would have to be shaped into the circle or it would have to be cut to the circle’s shape, which would defeat the point of a torpedo shape. For the amount of materials used, this design does well; however, since it is a circular shape it could prove difficult to craft the shapes into a perfect circle. This design offers a good amount of places for the net to be placed, since there is no front of back; however, it could throw of the balance of the craft.

The second design is the triangular craft. This craft would be great for turning and moving through the air because its triangular shape is aerodynamic. It would not have a great weight distribution since it would be an isosceles triangle and the weight would not all be right in the middle. This craft would be well suited for the foam torpedoes except the buoyant forces would not be spread equally since there would be more foam toward the front tip of the craft than the back. This craft would be the easiest to make and use the least materials since there are no oddly angled cuts. This craft is not well suited for the net because wherever it is put, it has to be placed very far out from the craft to avoid the disturbance the air would make on the water.



The final design is the traditionally shaped craft. It gets a good score for turning due to its pointed front. It would have good weight distribution because it is for the most part, an equal sided craft. Since it has equal port and starboard sides the foam torpedoes would fit perfectly inside of the skirt. This would use a large amount of materials due to the large number of cuts it would take to make. This design would be able to place the net in the greatest amount of areas without disturbing the net.

I also developed some hulls that are designed for an airboat. These designs differ from the hovercraft designs because there is no skirt involved. The hull designs will be rated on a chart with each of the specifications as categories.

One of the designs that I developed is a traditional airboat design. While this design looks rather simple, it is the traditional airboat design that has been used now for decades. One of the most common places this design is found in is the Florida Everglades. This design would be mobile and easy to maneuver because its design is conducive to cutting through the water. It would be environmentally friendly because it would sit on top of the water and would not damage any life forms below the surface. Once it was coated in fiberglass the boat would be water resistant. The hull would be somewhat stable because it is flat bottomed; however, since the craft does not extend below the surface of the water it would be very top heavy. The hull would be able to support a working anchor along with a net to collect plankton samples in, although deploying either may prove to be difficult because they would have to be deployed off of the sides.

My other airboat design is a cross between an airboat and a pontoon boat. It resembles an airboat because it has the fans in the back for propulsion and it resembles a pontoon boat because it floats on pontoons. This craft would be mobile but may have to move slower than a craft without pontoons though the water because of the drag they may create on a turn. The craft is environmentally friendly even though the pontoons extend into the water because only part of the pontoons extends into the water, not the entire craft. Once the craft was coated in fiberglass it would be water resistant. Since the pontoons sit in the water as opposed to on the surface of the water it would give the craft stability in the water and cancel out some of the weight on top of the craft due to the motors, anchor, and fans. This craft was designed to make collecting samples much easier. There is a hole in the middle of the craft between the pontoons to allow for the plankton net to be deployed from the center of the craft as opposed to the side. This modification should allow the plankton net to be deployed and retrieved with greater ease than if the net was located on the side of the craft.


Based on these results the pontoon airboat design is the design that I will proceed with developing and constructing.





Wednesday, September 23, 2009

Testing Procedure

Viability Testing

Preliminary testing is the first aspect of testing. During this phase I will do a few things.
  1. Develop brainstorming and ideas for solutions to the problem.
  2. Present these ideas to mentor.
  3. Ask mentor questions about the solutions and ask for explanations.
    • Are these viable solutions?
    • Are these environmentally friendly?
    • What could be improved upon?
    • Is it affordable?
  4. Repeat these steps until at least 3 viable alternate solutions are concieved.
Validation Testing

  1. Select 1 of the alternate solutions to be developed.
  2. Present these ideas to mentor.
  3. Ask the mentor questions and for explantions
    • Does the selected solution solve the problem?
    • Will a marine researcher benefit from this device?
  4. If any of the aforementioned questions are answered with a "no," repeat the viability testing and return to Validation testing.



The following are the steps needed to test the craft:

  1. Check to see if the craft is completed and all of the systems are in tact.
    • Check the motor for fuel.
    • Turn the motor on.
    • Check if the skirt fits sequrely to the hull (if hovercraft)
    • Turn on the fans.
    • Test if the skirt will lift the vehicle (if hovercraft)
    • Test the rudders by moving the vehicle forward.
    • Check the spool of the plankton net release to see if the string is wound without knots.
    • Release the spool.
    • Reel the net back in.
  2. Check the dimensions to the drawings.
  3. Test that it's waterproof.
  4. Check the battery and fuel source for any leaks.