Sunday, March 14, 2010

Construction Pictures

39 



38


37 



36

35


34

33


32

31

30


29


28


27

26

25


24


23


22

21


20


19


18


17


16


15


14


13


12


11


10


9


8


7


6


5


4


3


2


1

Friday, March 12, 2010

Progress Update - 3/12/10

March 12,2010, Friday

Today I was unable to fiberglass my craft due to the inclement weather. However, I was able to complete my outline for my upcoming presentation which is in regard to the construction of my craft. Hopefully, the weather will improve and I will be able to fiberglass soon.

Tuesday, March 9, 2010

Progress Update - 3/9/10

March 9, 2010, Tuesday

We had some issues with the gluing and the sides of the pontoons did not stick. I worked on them yesterday and hopefully they will be glued together today. If all goes well, I should be fiberglassing by tomorrow at the latest.

Monday, March 8, 2010

Progress Update - 3/8/10

March 8, 2010, Monday

Today, I will be working more on my pontoons. I just asked my mentor if I should fiberglass each piece individually and then fiberglass it together after or to only fiberglass the whole thing once. I may have to seal a few gaps in the plywood because the cuts may be a little off.

Friday, March 5, 2010

Progress Update - 3/5/10

March 5, 2010, Friday

We are currently encasing our pontoons in wood because the fiberglass resin dissolved the foam. We tried wrapping it in plastic but the heat from the reaction caused the foam to become coarse and very brittle. Along with help from my mentor and advisors we decided that covering the foam in plywood before fiberglassing is the best option because we had testing the resin on wood and it worked well: it did not cause any damage to the wood at all and the fiberglass hardened.

Sunday, February 28, 2010

Progress Update - 2/28/10



February 28, 2010, Sunday






















Wednesday, February 17, 2010

Progress Update - 2/17/10

February 17, 2010, Wednesday

This weekend I built my Plankton Net A-Frame at my work. The welder helped me make it and it is definitely sturdy. Yesterday, KR and I wet the deck in an attempt to straighten it out. Today, we will check on the deck and maybe work on fiberglassing.

Friday, February 5, 2010

Progress Update - 2/5/10

February 5, 2010, Friday

Well, today the fire alarm in the systems lab went off so we are not allowed in there to work. As a result, we were graciously allowed into the media center. So I'm not really sure what I'm going to do today. This is kind of fouling up my plans. I wanted to glue the pontoons together today; however, it looks like I will not be able to.

Thursday, February 4, 2010

Progress Update - 2/4/10

February 4, 2010, Thursday

Today, I will be testing out Liquid Nails on the foam. It should work without dissolving the foam. I'm going to have to wear a mask because breathing this stuff is not good for my health. It can cause cancer, birth defects, and central nervous system damage.  Wish me luck.

Wednesday, February 3, 2010

Progress Update - 2/3/10

February 3, 2010, Wednesday

Yesterday, I was sick, so I was unable to work on the craft any. But on Monday, I cut the foam into 48"x7"x2" strips. These strips will form the pontoons of the craft. I am going to go to Home Depot or Lowes tonight to as some questions about the adhesives and fiberglass cloth. Right now I am working on my Press Release.

Monday, February 1, 2010

Friday, January 22, 2010

Progress Update - 1/22/10

January 22, 2010, Friday

Well, the second marking period has come and gone and midterm week is upon us. Thankfully, our midterms were due earlier this week. It was a progress update to our mentor. Now that the third marking period is starting, we are going to begin construction of the craft. The first thing I have to do is to buy the materials for the craft. I need to buy plywood for the deck. I need to buy styrofoam for the pontoons. I also need epoxy, resin, and fiberglass cloth to encase the craft. Furthermore, I need PVC for the anchor arch. This is going to be a busy marking period.

Wednesday, January 13, 2010

Plan of Procedures

Material Processing Step
*Use Safety Goggles and Mask to promote safety
1. Measure out the plywood so that it is 60”x36”x1/4”
2. Cut with table saw
3. On plywood, measure out an 8”x24” rectangle, 1’2-1/6” in from the 36” side and 1’ down on the 48” side (Fig. 3)
4. Use the drill press to start the cut on one of the corners of the box
5. Cut the 8”x24” rectangle out of the plywood.
6. Measure 4’ on one side and on the opposite side measure 36- ½”.
7. From this point, draw a line to the corner of the foam block to the measure 36-1/2” as seen in the photo at right (Fig. 1)
Fig. 1 Side view of craft
8. Cut in a diagonal line from point to point so
it is now a trapezoid shape (Fig. 1)
9. Repeat for other foam block
10. Use the carpenter’s glue the foam pontoons to the plywood. The pontoons 4’ side matches up with the plywood’s 4’ side and the pontoons go on opposite sides of the plywood. (Fig. 2)
Fig. 2 Front view of craft
11. Wrap the entire craft in the fiberglass
cloth and make sure that all spaces are
covered
12. Apply the epoxy to the fiberglass
cloth
13. Apply resin to the epoxy and allow time
for the fiberglass cloth to dry
(don’t inhale the fumes)


 Fig. 1 Side view of craft


 Fig. 2 Front view of craft


 Fig 3 Top View of craft

Texture


Thursday, January 7, 2010

Progress Update - 1/7/10

January 7, 2010, Thursday

Well, devlopmental work didn't really turn out so well, so I am correcting it in preparation for the presentations. I have fixed my orthographic view for the most part, now I'm working on the isometric views. Hopefully I will be able to download AutoCAD in the very near future so I can work on these drawings at home as well as in school.

Tuesday, January 5, 2010